Monday, August 06, 2012

TARDIS 4

Here is a little bit more of the Tardis. I've done some work to it as you can see. The electrical system is starting to go in as you can see along with some of the detailed sections. I also have a habit (good or bad you decide) of placing pieces together that aren't ready to go together yet. Oh well.  I like to see how it's going to look, you know?


So first up is the roof with the LED in place ready for the lamp cover.


I've got some spacers in there to help keep the LED high enough so that it's centered in the lamp.


Here we have the lamp in place along with the light fixture that will illuminate the Police Public Call Box signs on the sides of the roof section.  That'll go right up underneath this section and hopefully give a nice glow to those signs.  I expect a lot of wire mucking it all up. Woohoo!

Speaking of those signs. Here are the frames for the signs being painted.


 Just a side view.

Here is one of the walls and the primed sign frame. This is a bit out of order. I just wanted to point out those 4 really thin rectangles were originally going to be part of those public call boxes. Realized they were a fragile waste of time. Scrapped!

 The base of the walls being put together. You learn a lot your first time through. I made the door frames a little too short and then had to add pieces to fill in the gap.  Ooops

 And here are two more pictures of it just resting together. Nothing is truly set yet save for the roof section. The rest is all gently balanced so as not to come crashing down. Really, this is a horrible habit of mine to test fit things so loosely.




More to come. Possibly tonight or tomorrow. I have done a lot of work on this over the past 2 weeks but there were just too many pictures for just one post.

No comments:

Post a Comment